Project Background

A national bank was building a Tier III disaster recovery center to meet regulatory requirements. The facility demanded the highest level of power reliability with fully redundant distribution paths.

Our Solution

We designed and manufactured a dual-bus power distribution system with hot-swappable breakers, real-time monitoring, and seismic-rated enclosures. The system supports seamless failover between primary and backup power sources.

Key Results

Achieved 99.999% power availability
Zero unplanned downtime since commissioning
Real-time monitoring across 48 distribution panels
Full redundancy with automatic failover in < 4ms
"The power distribution system from FlashDC has been rock-solid. Their engineering team understood our regulatory requirements from day one."

Sarah Liu

Director of IT Operations, National Banking Group

Have a Similar Requirement?

Let our engineering team design a solution tailored to your project needs.

Get in Touch